    Does anybody know the opening schedule of West Island Line? We plan to go to HK next March for 1-2 months and wondering should we rent an apartment near Sai Ying Pun or Western District.


  2. #2

    2014 sometime

    Last edited by Onyxwhisky; 17-07-2012 at 01:12 AM.

  3. #3

    Join Date
    Jan 2011
    Posts
    2,254
    SalseroHK likes this.

  4. #4

    Join Date
    Jun 2009
    Posts
    4
    Original Post Deleted
    This route map is very useful for my future planning. Thanks to all.

  5. #5

    Join Date
    Sep 2008
    Posts
    3,677
    Quote Originally Posted by stag:
    This route map is very useful for my future planning. Thanks to all.
    But note that the map itself might be misleading, for example the location of Central South has yet to be confirmed and therefore is excluded from the construction for the time being while the SIL-W may be decades away; same for the North Island Line and the Northern Link. They are all planned, but plans may change or not happen at all.

    So far only the KTL extension, WIL (extension of ISL), South Island Line East (SIL-E) and SCL are confirmed, beside the XRL or course.
    SalseroHK likes this.

  6. #6

    Join Date
    Oct 2005
    Location
    HK Island
    Posts
    194

    Is June 2014 still on track for opening the new stations?

    I searched both google and here but can't seem to find something recent.

    Also, will all stations open at the same time or will it be staggered with Sai Ying Pun / HKU first?

    Thanks!

    Last edited by SalseroHK; 11-08-2013 at 01:03 PM.

  7. #7

    Join Date
    Dec 2010
    Location
    Wrong side of the door to hell
    Posts
    6,079
    http://www.mtr-westislandline.hk/en/...ss-update.html

    Looks like, and given the onerous penalties for failure to meet deadlines in these contracts, it is not surprising.
    SalseroHK and HowardCoombs like this.

  8. #8

    Join Date
    Oct 2005
    Location
    HK Island
    Posts
    194
    Quote Originally Posted by kimwy66:
    http://www.mtr-westislandline.hk/en/...ss-update.html

    Looks like, and given the onerous penalties for failure to meet deadlines in these contracts, it is not surprising.
    many thanks kimwy66, that's a great link!

  9. #9

    Join Date
    Jun 2011
    Posts
    5,110

    Don't be so sure the line will certainly open on time. Penalties or not, if the contractors run into unexpected engineering problems, it can delay the opening of the project.

    There is for example media stories that the construction of the high speed line from West Kowloon to Shenzhen is running into difficulties and may have to be delayed. So far, we haven't heard of any similar negative news coming from the West Island Line, but that doesn't mean there will be no delays...

    SalseroHK likes this.

  10. #10

    Join Date
    Jan 2008
    Posts
    11,711

    probably fall of 2014