Schmidt Hammer Lassen to design new Island School

Closed Thread
  1. #1

    Join Date
    Jan 2008
    Posts
    743

    Schmidt Hammer Lassen to design new Island School

    Island School (ESF) is finally getting a face lift! Can't help but wonder how much it's going to cost - the designs look expensive...

    Links:
    http://isredevelopment.wordpress.com...opment-update/ (Island School Redevelopment website)
    http://www.bustler.net/index.php/art..._in_hong_kong/



    Last edited by shri; 21-02-2014 at 02:46 PM.

  2. #2

    Join Date
    Dec 2010
    Location
    Wrong side of the door to hell
    Posts
    6,021

    hmmm, interesting. Temporary site at Tai Wai.


  3. #3

    Join Date
    Dec 2002
    Location
    位置位置位置
    Posts
    50,278

    Thats going to be a hell of a commute for Mid Levels kids ...


  4. #4

    Join Date
    Dec 2010
    Location
    Wrong side of the door to hell
    Posts
    6,021

    Indeed, a long way for kids that probably have after school stuff set up on the Island. Could have quite an impact on other Island international schools as I imagine some parents would look to relocate their children to another school if they can. Very hard to just magic up a large enough school that is empty on the Island, I'm sure if they could they would.

    But ESF do have a good system for relocating schools. My daughter was at KJS the year they moved out to Hung Hom, the temporary school was refurbished to a high standard and much attention was paid to getting the children settled.


  5. #5

    Join Date
    Dec 2002
    Location
    Hong Kong
    Posts
    5,177

    lucky KJS were able to secure a campus not to far away. Tai Wai is going to be tough.

    The design does look AMAZING!


  6. #6

    Join Date
    Dec 2002
    Location
    位置位置位置
    Posts
    50,278

    Hung Hom seems like a short hop, skip and two jumps compared to travelling to Tai Wai.

    Anyways, parents have a few years to figure out. I think the current Y7 batch would have just finished their GCSEs when the construction starts - so could be a good time to relocate then.